Christmas 2014

Christmas 2014 & the tradies have left for their break. Over the last few weeks things have been moving along at a great pace, the brickies really get things done, neat & quick .

The ground slab has been poured and the brick work on the ground floor had been completed. We can start to see the layout coming together, our decisions about the positioning of the main rooms have been spot on and we are very happy with what the elevation will allow us to enjoy once completed ..

Looking out over the deck, steel in place for suspended slab pour in the new year , Photo taken from study area .

Front elevation , lower floor brick work complete

Lower floor

Bricks arrive.JPG

We sat on the slab for a quick look at the sunset , photo taken from bedroom 2 & 3 Level

P1130135.JPG

Bruce had me pulling cables today, VIP internet ones ..